Existing Pools Brought Back to Functional Condition

Pool Renovation & Remodeling in Loganville for aging pool surfaces, outdated equipment, and structural upgrades

Pool renovation starts with assessment of the existing structure to identify surface deterioration, equipment failures, plumbing leaks, and finish damage that affect water quality and system efficiency. Broussard Luxury Pools renovates pools across Loganville, Jefferson, and Blue Ridge, handling drain and refill planning, surface treatment or replaster, equipment upgrades, tile and coping refresh, and permit coordination if scope changes require structural modifications. Metro Atlanta's aging residential stock drives remodel demand, and springtime motivates pool refresh projects before the peak use season begins.


Renovation scope depends on what's failing: surface replastering addresses rough, stained, or cracking plaster; equipment replacement updates filtration, heating, and circulation systems that no longer maintain water clarity or temperature; and tile or coping replacement fixes broken, loose, or outdated perimeter finishes. Structural changes like adding benches, updating depths, or integrating spas require engineering review and permitting similar to new builds.


Schedule an assessment to review your pool's current condition, prioritize repairs, and estimate renovation scope based on visible and functional issues.

What Replastering and Equipment Upgrades Involve

Replastering begins with draining the pool completely, then chipping away the old plaster surface down to the gunite shell, repairing any cracks or hollow spots in the underlying structure, and applying new plaster in a single continuous coat to prevent seams or weak points. Equipment upgrades replace old pumps, filters, heaters, and automation controls with current models that run more efficiently, move water more effectively, and integrate with smart controls or remote apps. Tile replacement involves removing damaged tiles along the waterline or spa edges, cleaning the substrate, and setting new tiles with waterproof adhesive and grout.


After renovation completes, you'll notice the surface feels smooth without rough patches that scratch feet, water stays clear longer between chemical adjustments, and equipment operates quietly without the rattling or grinding sounds that signal failing motors or bearings. Broussard Luxury Pools manages existing system preservation throughout the renovation process, protecting plumbing lines and electrical connections that don't require replacement.


Renovation scope covers the specific repairs and upgrades identified during assessment, but doesn't automatically include deck resurfacing, landscaping changes, or full equipment replacement unless those systems are failing or outdated. Timeline depends on whether the pool drains naturally or requires pumping, how extensive plaster repairs are, and whether equipment is in stock or requires ordering.

Questions Before Starting Pool Renovation Work

Renovation projects involve prioritizing repairs, managing downtime, and deciding which systems to upgrade, and these questions help clarify what the process requires and how decisions affect cost and timeline.

  • What signs indicate a pool needs replastering in Loganville?

    Rough patches that catch on swimsuits, visible aggregate showing through thin plaster, staining that doesn't respond to chemical treatment, or frequent pH swings caused by deteriorating plaster all signal that resurfacing is overdue and affecting water quality.

  • How long does pool replastering take from drain to refill?

    Draining takes one to two days, surface preparation and plaster application take another two to three days, and curing requires seven to ten days before refilling, so total downtime typically runs two weeks under normal spring and summer conditions in North Georgia.

  • What equipment upgrades provide the most noticeable improvement?

    Replacing single-speed pumps with variable-speed models cuts energy costs and reduces noise, upgrading to cartridge filters improves water clarity and reduces backwash frequency, and adding automation controls simplifies chemical dosing and temperature management.

  • When should I schedule renovation to minimize disruption?

    Early spring renovations complete before warm-weather use begins and take advantage of moderate temperatures that help plaster cure evenly, while fall renovations prepare the pool for the following season and avoid peak-season downtime when you'd otherwise be using the pool.

  • What happens if structural issues appear during surface renovation?

    Cracks, hollow spots, or leaks discovered during plaster removal require additional gunite patching or structural reinforcement before replastering proceeds, which adds cost and timeline but prevents recurring surface failures or worsening structural damage.

Broussard Luxury Pools handles renovation scope alongside new builds and documents the process from initial assessment through final system testing. Contact the team to schedule a pool evaluation and discuss renovation priorities, equipment options, and project timing based on your pool's current condition and usage plans.